Nemak Pilsting
operating- Status
- operating
The plant does not melt metal: since March 2015 it has carried out secondary processing of aluminium structural castings after the casting process, and since 2019 also assembly – bonding, self-piercing riveting and spot welding. The metal arrives here as AlSi10MnMg (Silafont-36) alloy castings made at other group plants.
Verified at source: