Zinkgruvan
operating- Output 2024
- 3.96 kt Cu w koncentracie (contained)
2025 = sum: Lundin Q1 0 t (Cu campaign not run) + Boliden since acquisition 3 kt (rounded). Class C for 2025.
Verified at source:
- B Lundin Mining, „Announces Record Production Results for 2024 and Provides 2025 Guidance” (16.01.2025), s. 2 – tabela Copper (t) s. 2
- A Boliden AB, Annual and Sustainability Report 2025 – Ten-year overviews: mines (PDF pp. 183–186, print P.181–184), Rönnskär smelter (PDF p. 186) and Harjavalta (PDF p. 187); plant descriptions (PDF p. 23) PDF s. 186
- A Management's Discussion and Analysis and Consolidated Financial Statements, year ended December 31, 2024 MD&A s. 30 (Neves-Corvo) i s. 32 (Zinkgruvan), tabele „Operating Statistics (Discontinued Operation)” – Production (contained metal), Zinc (t)
- A 2023 Annual MD&A and Financial Statements MD&A s. 24 (Neves-Corvo) i s. 25 (Zinkgruvan), „Operating Statistics” (2023 i 2022)
- A 2021 Annual MD&A and Financial Statements PDF s. 20 (Neves-Corvo) i s. 22 (Zinkgruvan), „Operating Statistics” (2021 i 2020)
- A 2020 Annual MD&A and Financial Statements PDF s. 20 (Neves-Corvo) i s. 22 (Zinkgruvan), „Operating Statistics” (2020 i 2019)
- B Interim Report for the fourth quarter and year-end report 2025 s. 36 (Boliden Area, Tara), s. 37 (Garpenberg), s. 39 (Somincor), s. 40 (Zinkgruvan), tabela „Full-year data per unit – Mines”
- A 2025 Annual MD&A and Financial Statements MD&A s. 19, „Production Overview” – Zinc (t), Neves-Corvo i Zinkgruvan do 16.04.2025
- B EEA, Industrial Reporting under the IED and E-PRTR, wersja 16 (2007–2024): pliki „F6_1_IED_Installations.csv”, „F1_4_Air_Releases_Facilities.csv”, „F3_2_Transfers_Facilities.csv”, „F4_2_WasteTransfers_Facilities.csv” reporting year 2024; IED installations 2.5(a), 2.5(b), 2.3(c), 4.2(e), 5.1; E-PRTR facilities 2(e), 3(a), 5(a)