KCM Plovdiv (zinc and lead plant)
operating- Capacity
- 100 kt/yr100 kt/yr per permit (KCM investment notification 2021, B); after upgrade 134 kt/yr of zinc in ingots and alloys.
Verified at source:
- B КЦМ АД – уведомление за инвестиционно предложение „Технологично интегриране на КЦМ АД” (вх. 492/2021), z przytoczeniem KR nr 1-Н3/2017 akt. 2020 pp. 2–3 (capacities from KR No. 1-Н3/2017: 100,000 t/yr Zn currently, 134,000 t/yr target), p. 6 (share of secondary raw materials 25% → 35%)
- B EBI – KCM Lead Zinc Capacity Expansion (2018-0781): EFSI Scoreboard i Environmental and Social Data Sheet EFSI Scoreboard s. 1–2; ESDS s. 1–2
- C BGS – World Mineral Production 2020–24, table “Production of slab zinc” (and the 2019–23 edition for 2019) s. 78 – Netherlands; s. 78 – France; s. 78 – Spain; s. 78 – Germany; s. 78 – Italy; s. 78 – Bulgaria; s. 78 (wyd. 2020–24) i odpowiednia tabela wyd. 2019–23
- A Eurostat PRODCOM DS-059358 – sold production, kody 24431230 i 24431250 ES 24431230 2023; 24431250 2019–2024; IT 24431230 2019–2024; BG 24431230/24431250 – :C; dataset DS-059358, indicators PRODQNT/PQNTFLAG/PQNTBASE/OWNPRODQNT; unit KG converted to t
- B EEA, Industrial Reporting under the IED and E-PRTR, wersja 16 (2007–2024): pliki „F6_1_IED_Installations.csv”, „F1_4_Air_Releases_Facilities.csv”, „F3_2_Transfers_Facilities.csv”, „F4_2_WasteTransfers_Facilities.csv” reporting year 2024; IED installations 2.5(a), 2.5(b), 2.3(c), 4.2(e), 5.1; E-PRTR facilities 2(e), 3(a), 5(a)
- B Best Available Techniques (BAT) Reference Document for the Non-Ferrous Metals Industries (JRC107041) p. 25 (PDF 77), table 1.17; p. 635 (PDF 687), table 6.4; p. 25 (PDF 77), table 1.17 (source: IZA plant data 2008)
- C Conference abstract by KCM staff on the expansion of the Waelz furnaces (tentative lead)