ChemiePark Bitterfeld-Wolfen
operating- Capacity
- 1 kt/yrIBU-tec GB 2023, p. 41: plan to increase MBTC capacity to approx. 1,000 t/yr; GB 2024, p. 42: “Statt der geplanten 1.000 Tonnen MBTC wurden nur 695 Tonnen verkauft”
- Output 2024
- 0.70 kt MBTC
Verified at source:
- A IBU-tec advanced materials AG – Geschäftsbericht 2023 (Konzernlagebericht) s. 41 (BNT GmbH), s. 26
- A IBU-tec advanced materials AG – Geschäftsbericht 2024 (Konzernlagebericht, pkt 2.2.2 BNT GmbH) s. 42
- A IBU-tec advanced materials AG – Geschäftsbericht 2025 s. 22, 37–38, 40
- B BNT Chemicals – home page (figures in the header) figures section on the home page
- B EEA – Industrial Reporting under the IED and E-PRTR (baza [IED].[latest], ProductionFacility) facility record (namespace/localId) – Annex I activity code, coordinates
- B GLEIF – Global LEI Index, API lei-records i fuzzycompletions
- A EEA – Industrial Reporting under the Industrial Emissions Directive 2010/75/EU and European Pollutant Release and Transfer Register Regulation (EC) No 166/2006 (discodata, tabele [IED].[latest].[ProductionFacility] i [ProductionInstallation])