Medina del Campo – plant producing secondary lead and lead alloys from batteries and other lead-bearing waste
operating- Status
- operating
Products: Other unwrought lead and lead alloys (PbCa, PbSn, bullion lead)
Lead production plant permitted for 70,000 t of lead and alloys a year; the feedstock is batteries and other lead-bearing waste, largely imported.
Verified at source:
- B BOCYL no. 109 of 8.06.2022 – Orden: amendment of the autorización ambiental, planta de producción de plomo, Metalúrgica de Medina, S.A. s. 1–3
- B EEA, Industrial Reporting under the IED and E-PRTR, wersja 16 (2007–2024), plik „F6_1_IED_Installations.csv” (User friendly .csv files) ES.CAED/002702000.INSTALLATION