Fact register · R02-K-EU27-SEMIS-WIRE-ROD-CAGR

Copper wire rod output, EU-27 – CAGR 2025–2031

0.40 %/r.

EU27 · 2025–2031 · Cu copper

80% interval: -2 – 3 %/r. (10th and 90th percentile of the forecast distribution)

Note: Średnie roczne tempo zmian 2025–2031; przedział 80% (10.–90. percentyl).

.md .json API

Primary source
Prognoza produkcji wyrobów z miedzi w UE 2026–2031 – model hybrydowy ai-waw.com (popyt sektorowy, handel, zakłady; kotwica IWCC 2012–2025) · ai-waw.com (obliczenia); dane: IWCC (Semis Production and Demand, End Use Summary), Eurostat PRODCOM, Comext, STS, wskaźniki produkcji; MFW; sprawozdania spółek
Source class
C
Checked
2026-10-17
Verification
model forecast
In forecast
Copper semi-finished products output in the EU 2026–2031 · AIWAW-2026-R02 v2.0 · all facts of the analysis

How to cite this number

ai-waw.com, AIWAW-2026-R02 v2.0, fact R02-K-EU27-SEMIS-WIRE-ROD-CAGR – https://ai-waw.com/prognozy/produkcja-wyrobow-z-miedzi-ue-2026-2031

Other facts from this publication

3,946.4 tys. t
EU-27: copper and copper-alloy semis output (excluding wire rod) in 2031 (80% interval) · EU27 · 2031
R02-K-EU27-SEMIS-2031
0.10 %/r.
Alloy rods, bars and sections output, EU-27 – CAGR 2025–2031 · EU27 · 2025–2031
R02-K-EU27-SEMIS-ALLOY-BARS-PROFILES-CAGR
0.20 %/r.
Copper-alloy semis output, EU-27 – CAGR 2025–2031 · EU27 · 2025–2031
R02-K-EU27-SEMIS-ALLOY-CAGR
-0.20 %/r.
Alloy plate, sheet and strip output, EU-27 – CAGR 2025–2031 · EU27 · 2025–2031
R02-K-EU27-SEMIS-ALLOY-SHEET-STRIP-CAGR
-0.60 %/r.
Alloy tube output, EU-27 – CAGR 2025–2031 · EU27 · 2025–2031
R02-K-EU27-SEMIS-ALLOY-TUBES-CAGR
-0.40 %/r.
Copper-alloy wire output, EU-27 – CAGR 2025–2031 · EU27 · 2025–2031
R02-K-EU27-SEMIS-ALLOY-WIRE-CAGR
0.30 %/r.
Copper and copper-alloy semis output (excluding wire rod), EU-27 – CAGR 2025–2031 · EU27 · 2025–2031
R02-K-EU27-SEMIS-CAGR
-0.10 %/r.
Copper rods, bars and sections output, EU-27 – CAGR 2025–2031 · EU27 · 2025–2031
R02-K-EU27-SEMIS-COPPER-BARS-PROFILES-CAGR