# Terrafame Oy

Group: Terrafame Group (Suomen Malmijalostus)  
Ownership path: Terrafame Oy (company, LEI 743700OPAGYTEQ8MLN68) → [Finnish Minerals Group Oy](https://ai-waw.com/en/companies/groups/finnish-minerals-group-oy.md) (corporate group, LEI 743700Z87EC2F8X13F78)  
Country of seat: Finland  
Data as of: 2026-10-21, version 2.32  
Page: https://ai-waw.com/en/companies/terrafame-oy

## Plants

### Sotkamo – mine and metals plant (Ni, Zn, Co, sulphates for batteries) (Sotkamo, Finland)

- Link: mine and concentrator
- Status: operating
- Metals: nickel, zinc, cobalt, copper
- Coordinates: 63.97, 28 (© OpenStreetMap contributors, ODbL 1.0)
- Source [A]: Terrafame, Financial Review 2025 (26.03.2026) – management report: record nickel output in 2025, mining permit for 18 million t of ore per year (PDF pp. 5, 19) – https://mb.cision.com/Public/20514/4327358/8ce607aae42653fd.pdf
- Source [B]: Terrafame, “Battery chemicals” page – nickel sulphate and cobalt sulphate – https://www.terrafame.com/offering/battery-chemicals.html
- Source [B]: Terrafame's net sales in 2020 were EUR 338.3 million, EBITDA for Q4 was 17.1% of net sales (komunikat), tabela „Zinc produced, tonnes” (2020 i 2019) – https://www.terrafame.com/newsroom/media-releases/terrafames-net-sales-in-2020-were-eur-338.3-million-ebitda-for-q4-was-17.1-of-net-sales.html
- Source [B]: Terrafame Financial Review 2024, entire document – no zinc production volume – https://mb.cision.com/Public/20514/4123868/8332372d6e7c9634.pdf
- Source [B]: World Mining Data 2026 – 6.4 Production of Mineral Raw Materials of individual Countries, by Minerals (arkusz „Zinc”), “Zinc” sheet, 2020–2024 (marked “r” – reported) – https://www.bmf.gv.at/dam/jcr:ed3d811d-6edd-4bf9-b564-40cacaedac94/6.4.%20Production_of_Mineral_Raw_Materials_of_individual_Countries_by_Minerals.xlsx
- Source [B]: EEA, Industrial Reporting under the IED and E-PRTR, wersja 16 (2007–2024): pliki „F6_1_IED_Installations.csv”, „F1_4_Air_Releases_Facilities.csv”, „F3_2_Transfers_Facilities.csv”, „F4_2_WasteTransfers_Facilities.csv”, reporting year 2024; IED installations 2.5(a), 2.5(b), 2.3(c), 4.2(e), 5.1; E-PRTR facilities 2(e), 3(a), 5(a) – https://sdi.eea.europa.eu/datashare/s/sptXqwkQr5g7Bp5/download?path=/eea_t_ied-eprtr_p_2007-2024_v16_r00
- Note: Heap leaching of polymetallic ore – intermediate products (Ni-Co, Zn, Cu sulphides) and Ni and Co sulphates, mining permit for up to 18 million t of ore per year.
- Verified at source: 2026-10-08

## Metal flow analyses

- [EU-27 Zinc Flows](https://ai-waw.com/en/metal-flows/eu-zinc-flow-analysis.md)
- [EU Copper Flow Analysis](https://ai-waw.com/en/metal-flows/eu-copper-flow-analysis.md)
