{"meta":{"publisher":"ai-waw.com","date":"2026-10-18","version":"2.22","verified_to":"2026-10-18","changes":"https://ai-waw.com/en/companies/changes","language_note":"Site names, quantities, units, notes and source titles are kept in the original (Polish) wording of the register.","source_classes":{"A":{"pl":"statystyka publiczna, akt prawny, sprawozdanie finansowe","en":"official statistics, legal act, financial statement"},"B":{"pl":"raport spółki, grupa studyjna, stowarzyszenie branżowe","en":"company report, study group, industry association"},"C":{"pl":"prasa branżowa, komunikat bez danych źródłowych","en":"trade press, release without underlying data"}},"coords_licence":{"id":"ODbL-1.0","url":"https://opendatacommons.org/licenses/odbl/1-0/","attribution":"© współtwórcy OpenStreetMap","attribution_url":"https://www.openstreetmap.org/copyright","text":"Coordinates (lat, lon, x, y) of plants with coords_licence = ODbL-1.0 were obtained with the OSM Nominatim geocoder; this layer of the dataset is made available under the Open Database License 1.0 (ODbL) – it may be copied, adapted and redistributed with attribution and under the same licence."}},"entity":{"slug":"glencore","name":"Glencore","group":"Glencore","country":"DE","countries":["DE"],"metals":["zn"],"stages":["huta"],"sites":["zn-h09"],"url":"https://ai-waw.com/en/companies/glencore","markdown":"https://ai-waw.com/en/companies/glencore.md","identifiers":null,"corporate_group":{"slug":"glencore","id":"2138002658CPO9NBH955","name":"Glencore","lei":"2138002658CPO9NBH955","ultimate":{"name":"Glencore","lei":"2138002658CPO9NBH955","country":"JE"},"url":"https://ai-waw.com/en/companies/groups/glencore","markdown":"https://ai-waw.com/en/companies/groups/glencore.md"}},"sites":[{"code":"zn-h09","entity":"glencore","name":"Glencore Nordenham","city":"Nordenham","country":"DE","lat":53.48,"lon":8.47,"x":442.7,"y":465.4,"coords_licence":null,"stage":"huta","stage_group":"metal","stage_label":"zinc smelter","metals":["zn"],"cn":[],"capacity":165,"capacity_unit":"kt/rok","capacity_note":"nominalna","production":null,"production_unit":null,"production_year":null,"status":"czynna","class":"A","verified":"2026-10-08","analyses":["zn-ue"],"roles":[],"sources":[{"title":"MINING.COM, „Zinc squeeze worsens as a second European smelter closes”","url":"https://mining.com","page":null,"class":"B"},{"title":"Nordenhamer Zinkhütte GmbH, sprawozdanie finansowe za 2024 r. (rejestr lobbingowy Bundestagu)","url":"https://www.lobbyregister.bundestag.de/media/0a/be/542254/Nordenhamer-Zinkhuette-GmbH-JA-2024-Finales-Testatsexemplar-mit-QES.pdf","page":null,"class":"A"},{"title":"Glencore Nordenham – strona (Über uns, Impressum, Aktuelles)","url":"https://www.glencore-nordenham.de/de/ueber-uns","page":"Über uns – „über 170.000 Tonnen Zink und Zinklegierungen pro Jahr”; Impressum","class":"B"},{"title":"Glencore – Third Quarter 2022 Production Report","url":"https://www.glencore.com/.rest/api/v1/documents/d305415f650e94ae02f7435c9c2b9305/GLEN_2022-Q3_ProductionReport.pdf","page":"s. 7","class":"B"},{"title":"Glencore – Full Year 2022 Production Report","url":"https://www.glencore.com/.rest/api/v1/documents/339ef1dcf7760cd324177d077d342bb6/GLEN_2022-FY_ProductionReport.pdf","page":"s. 6","class":"B"},{"title":"Glencore – Full Year 2024 Production Report","url":"https://www.glencore.com/.rest/api/v1/documents/static/437c6cdb-dbfb-4e61-a769-18655951cee2/Glencore+production+report_FY2024.pdf","page":"s. 5–6 (agregat: Portovesme, Asturiana, Nordenham, Northfleet, CEZ); s. 6; s. 5–6, 13","class":"B"},{"title":"Glencore – Full Year 2025 Production Report","url":"https://www.glencore.com/.rest/api/v1/documents/static/a8114247-02e8-4bd8-bc04-81f411ba631c/GLEN_2025-FY-Production-Report.pdf","page":"s. 7","class":"B"},{"title":"Glencore investiert rund 33 Millionen Euro in Modernisierung der Zinkhütte in Nordenham","url":"https://www.glencore-nordenham.de/de/aktuelles/nachrichten/glencore-investiert-33-millionen-euro-in-nordenhamer-zinkhuette","page":"komunikat","class":"B"},{"title":"Glencore Nordenham nimmt neuen Wirbelofen in Betrieb","url":"https://www.glencore-nordenham.de/de/aktuelles/nachrichten/Glencore-Nordenham-nimmt-neuen-Wirbelofen-in-Betrieb","page":"komunikat","class":"B"},{"title":"ILZSG – Press release „Review of trends in 2024 – Zinc”","url":"https://ilzsg.org/wp-content/uploads/3.PRESS%20RELEASES/20250224_ILZSG%20February%202024%20Press%20Release%20Zn.pdf","page":"s. 1; s. 2 – Annual data, Refined Production – Europe","class":"B"},{"title":"BGS – World Mineral Production 2020–24, tabela „Production of slab zinc” (oraz wyd. 2019–23 dla 2019)","url":"https://nora.nerc.ac.uk/id/eprint/541620/1/WMP_2020%20to%202024.pdf","page":"s. 78 – Netherlands; s. 78 – France; s. 78 – Spain; s. 78 – Germany; s. 78 – Italy; s. 78 – Bulgaria; s. 78 (wyd. 2020–24) i odpowiednia tabela wyd. 2019–23","class":"C"},{"title":"EEA, Industrial Reporting under the IED and E-PRTR, wersja 16 (2007–2024): pliki „F6_1_IED_Installations.csv”, „F1_4_Air_Releases_Facilities.csv”, „F3_2_Transfers_Facilities.csv”, „F4_2_WasteTransfers_Facilities.csv”","url":"https://sdi.eea.europa.eu/datashare/s/sptXqwkQr5g7Bp5/download?path=/eea_t_ied-eprtr_p_2007-2024_v16_r00","page":"rok sprawozdawczy 2024; instalacje IED 2.5(a), 2.5(b), 2.3(c), 4.2(e), 5.1; zakłady E-PRTR 2(e), 3(a), 5(a)","class":"B"},{"title":"GLEIF – Global LEI Index, API lei-records i fuzzycompletions","url":"https://api.gleif.org/api/v1/lei-records","page":null,"class":"B"}],"note":"Produkcja wstrzymana w 2022 r. wskutek wzrostu cen energii; wznowiona w I kwartale 2024 r., a rok 2025 zakład przepracował w pełnym wymiarze (Glencore, raport produkcyjny za 2025 r.). Trwa modernizacja o wartości ok. 33 mln EUR z zakończeniem przewidzianym na wiosnę 2026 r. i stopniowym uruchomieniem zmodernizowanej instalacji."}],"flows":[],"analyses":[{"key":"zn-ue","url":"https://ai-waw.com/en/metal-flows/eu-zinc-flow-analysis","title":"EU-27 Zinc Flows","in":true}]}