# Boliden Mineral AB

Group: Boliden  
Ownership path: Boliden Mineral AB (company, LEI 213800X3MEX5WPW7DI33) → [Boliden](https://ai-waw.com/en/companies/groups/boliden.md) (corporate group)  
Country of seat: Sweden  
Data as of: 2026-10-21, version 2.32  
Page: https://ai-waw.com/en/companies/boliden-mineral-ab

## Plants

### Boliden Area (Kristineberg with Rävliden, Renström; Boliden concentrator) (Boliden, Sweden)

- Link: mine and concentrator
- Status: operating
- Metals: zinc
- Output 2024: 48.7 kt Zn zawartego w koncentracie
- Coordinates: 65.0651, 18.5637
- Source [B]: Interim Report for the fourth quarter and year-end report 2024, s. 35–36, tabela „Full-year data per unit – Mines” (dane w tonach, 2024 i 2023) – https://investors.boliden.com/sites/boliden-ir/files/pr/202502052475-1.pdf
- Source [B]: Interim Report for the fourth quarter and year-end report 2025, s. 36 (Boliden Area, Tara), s. 37 (Garpenberg), s. 39 (Somincor), s. 40 (Zinkgruvan), tabela „Full-year data per unit – Mines” – https://investors.boliden.com/sites/boliden-ir/files/pr/202602025006-1.pdf
- Source [A]: Annual and Sustainability Report 2024, s. 180–182 (PDF), Other – Ten-year overviews – Mines (wiersz „Production of metal in concentrate – Zn, ktonnes”); s. 22 (Kokkola), s. 24 (Raw material feed – zinc), s. 98 (secondary feed), s. 184 (Ten-year overviews – Smelters); s. 22, s. 184 – https://investors.boliden.com/sites/boliden-ir/files/pr/202503192744-1.pdf
- Source [A]: Annual and Sustainability Report 2025, s. 183–186 (PDF), Ten-year overviews – Mines (Garpenberg, Boliden Area, Tara, Somincor, Zinkgruvan); s. 23, s. 25 (Raw material sourcing – Zinc), s. 187 (druk. s. 185, Ten-year overviews) – https://investors.boliden.com/sites/boliden-ir/files/pr/202603040118-1.pdf
- Source [B]: EEA, Industrial Reporting under the IED and E-PRTR, wersja 16 (2007–2024): pliki „F6_1_IED_Installations.csv”, „F1_4_Air_Releases_Facilities.csv”, „F3_2_Transfers_Facilities.csv”, „F4_2_WasteTransfers_Facilities.csv”, reporting year 2024; IED installations 2.5(a), 2.5(b), 2.3(c), 4.2(e), 5.1; E-PRTR facilities 2(e), 3(a), 5(a) – https://sdi.eea.europa.eu/datashare/s/sptXqwkQr5g7Bp5/download?path=/eea_t_ied-eprtr_p_2007-2024_v16_r00
- Source [B]: GLEIF – Global LEI Index, API lei-records i fuzzycompletions – https://api.gleif.org/api/v1/lei-records
- Verified at source: 2026-10-11

### Rönnskär – smelter (electrolysis plant being rebuilt) (Skelleftehamn, Sweden)

- Link: smelter
- Status: operating
- Metals: copper, zinc
- CN: 7402 (anody), 7403 11
- Capacity: 230 kt Cu/yr
- Output 2024: 0 kt Cu – cathodes (2024; anodes only since 06.2023)
- Coordinates: 64.68, 21.23
- Source [A]: Boliden AB, Annual and Sustainability Report 2025 (PDF p. 23 smelters; p. 25 “Raw material sourcing” and mine–smelter map; pp. 32–33 Harjavalta; pp. 183–187 ten-year overviews), PDF s. 23, 25, 186 – https://investors.boliden.com/sites/boliden-ir/files/pr/202603040118-1.pdf
- Source [A]: Boliden AB, Annual and Sustainability Report 2024 (PDF p. 24 mine–smelter map, e-scrap recycling 120 kt/yr, Rönnskär secondary materials; pp. 39–40, 44 and 141 anode sales; p. 183 Rönnskär summary), PDF s. 24, 39–40, 44, 141, 183 – https://investors.boliden.com/sites/boliden-ir/files/pr/Boliden_AR_2024_ENG%20Print.pdf
- Source [B]: Boliden, plant sheets for Kokkola and Rönnskär – https://boliden.com
- Note: Zinc as a co-product stream of the copper complex.
- Verified at source: 2026-10-08

## Scrap buyer

> A picture of the market – not a commercial recommendation.

- Rönnskär – smelter (electrolysis plant being rebuilt) (Skelleftehamn, Sweden): smelter; Metal: copper; Accepted grades: grades not established in the register documents

[Scrap buyers in the Recycling tab](https://ai-waw.com/en/recycling.md)

## Technology suppliers

- Metso Finland Oy → [Rönnskär – smelter (electrolysis plant being rebuilt) (Boliden Mineral AB, Skelleftehamn)](https://ai-waw.com/en/companies/boliden-mineral-ab#se-boliden-ronnskar): smelting and converting plant – Kaldo furnace for the expansion of the electronic scrap recycling facility at the Rönnskär smelter (capacity from 45,000 to 120,000 t/y); commissioning planned for end of 2011. (2010); ordered; Source [B] Outotec press release of 07.05.2010 on the delivery of a Kaldo furnace for Boliden (metso.com) – https://www.metso.com/corporate/media/news/2010/5/outotec-to-deliver-kaldo-furnace-technology-for-boliden-in-sweden/

## Material flows

- Cu concentrate: Aitik → Rönnskär – smelter (electrolysis plant being rebuilt) – 60 kt Cu in concentrate (Aitik output) (2024)
- Cu concentrate: Kevitsa → Harjavalta – Cu-Ni smelter, Rönnskär – smelter (electrolysis plant being rebuilt) – 26 kt Cu in concentrate (Kevitsa output) (2024)
- Cu concentrate (and Pb): Boliden Area (Renström, Kristineberg, Kankberg), Garpenberg → Rönnskär – smelter (electrolysis plant being rebuilt) – 4 kt Cu (total output) (2024)
- Cu concentrate – Boliden internal feed (balance): Aitik, Kevitsa, Boliden Area (Renström, Kristineberg, Kankberg), Garpenberg → Rönnskär – smelter (electrolysis plant being rebuilt), Harjavalta – Cu-Ni smelter – 393 kt gross (2024)
- Cu anodes: Rönnskär – smelter (electrolysis plant being rebuilt) → Pori – elektrorafineria
- Cu concentrate: Neves-Corvo, Zinkgruvan → Rönnskär – smelter (electrolysis plant being rebuilt), Harjavalta – Cu-Ni smelter

## Metal flow analyses

- [EU Copper Flow Analysis](https://ai-waw.com/en/metal-flows/eu-copper-flow-analysis.md)
- [EU-27 Zinc Flows](https://ai-waw.com/en/metal-flows/eu-zinc-flow-analysis.md)
