# Boliden Kevitsa Mining Oy

Group: Boliden  
Ownership path: Boliden Kevitsa Mining Oy (company, LEI 213800N23OXX3A52TU74) → [Boliden](https://ai-waw.com/en/companies/groups/boliden.md) (corporate group)  
Country of seat: Finland  
Data as of: 2026-10-20, version 2.31  
Page: https://ai-waw.com/en/companies/boliden-kevitsa-mining-oy

## Plants

### Kevitsa (Sodankylä, Finland)

- Link: mine and concentrator
- Status: operating
- Metals: copper
- CN: 2603 (koncentrat Cu)
- Output 2024: 26 kt Cu w koncentracie (contained)
- Coordinates: 67.7, 26.97
- Source [A]: Boliden AB, Annual and Sustainability Report 2025 – Ten-year overviews: mines (PDF pp. 183–186, print P.181–184), Rönnskär smelter (PDF p. 186) and Harjavalta (PDF p. 187); plant descriptions (PDF p. 23), PDF s. 185 – https://investors.boliden.com/sites/boliden-ir/files/pr/202603040118-1.pdf
- Source [A]: Boliden AB, Annual and Sustainability Report 2025 (PDF p. 23 smelters; p. 25 “Raw material sourcing” and mine–smelter map; pp. 32–33 Harjavalta; pp. 183–187 ten-year overviews), PDF s. 25 – mapa: Kevitsa → Harjavalta, Rönnskär – https://investors.boliden.com/sites/boliden-ir/files/pr/202603040118-1.pdf
- Note: Ni-Cu-PGM mine; Cu concentrate to Harjavalta/Rönnskär. Total ≈ Finland’s mining output per BGS (20.1 / 26.4 kt).
- Verified at source: 2026-10-08

## Material flows

- Cu concentrate: Kevitsa → Harjavalta – Cu-Ni smelter, Rönnskär – smelter (electrolysis plant being rebuilt) – 26 kt Cu in concentrate (Kevitsa output) (2024)
- Cu concentrate – Boliden internal feed (balance): Aitik, Kevitsa, Boliden Area (Renström, Kristineberg, Kankberg), Garpenberg → Rönnskär – smelter (electrolysis plant being rebuilt), Harjavalta – Cu-Ni smelter – 393 kt gross (2024)

## Metal flow analyses

- [EU Copper Flow Analysis](https://ai-waw.com/en/metal-flows/eu-copper-flow-analysis.md)
